BLOG POST
Diorit Gradnja d.o.o. successfully finished the project of building bridge in Zenica
- By Diorit Gradnja d.o.o.
- January 21, 2022
- No Comments
BRIDGE - BABINA RIJEKA

One of the most demanding buildings on the subsection Klopče – Donja Gračanica. The Babina Rijeka viaduct will be connected in The viaduct is built using the technology of free cantilever construction and crosses the valley. Babina riverbeds at a maximum height of 120 meters from the river level to the road level. The final spans are 110 meters long, and the main span is 165 meters. Our company has done several jobs as subconstructor on this project.
Project summary :
- Execution of works on installation of pipes
- Installation of prestressing cables (OVM system)
- Grouting
"We have always been extremely pleased to respond to all client requests. The construction of this bridge is of great importance for our company"
Get a free quotes
Others services
Download brochure
We focus on each detail on any phase of the project, where we prepare detailed reports on each situation for the investor
Our Director

Alen Evlić
Our goal is to be globally recognized as a company that offers only the highest quality construction services

Diorit Gradnja d.o.o. successfully finished the project of building the Green Bridge in Banja Luka

Diorit Gradnja d.o.o. successfully finished the project of building bridge in Zenica
